Production Scheduling

Production scheduling, solved mathematically.

makespan converts weekly order volumes into production schedules using mathematical programming, then tracks actual vs. planned output in real time.

168h

Full-week coverage

Real-time

Deviation tracking

Live System View

Your entire production flow, mapped and managed.

makespan models every path in your facility — silos, blending, processing, filling. When a disruption hits, re-run the solver from the current position — completed work is locked in.

Raw MaterialBlendingProcessingBufferingFillingSilo ASilo BSilo CMix-1Mix-2Unit 1Unit 2Unit 3CIPBuf-1Buf-2Buf-3CIPLine 18 m³/hLine 28 m³/hLine 3CIP

Features

Schedule, track, and review — all in one place.

From schedule generation to post-week analysis — everything in a single workflow.

Automated Scheduling

Upload your weekly order volumes. makespan generates a full production schedule across all lines, accounting for changeover times, cleaning constraints, and line capacities.

  • MILP solver (HiGHS/PuLP)
  • Changeover & CIP constraints
  • Split-order handling
  • Manual override support
Generated schedule · 3 lines · 168h
L1Premium Blend 1.0LMon 06:00
L1CIP washMon 14:30
L2Light Mix 500mLMon 06:00
L2Classic Blend 1.0LTue 07:00
L3Standard Mix 1.0LMon 06:00
L3CIP washMon 22:00
Feasible · all orders coveredHiGHS solver

AI-assisted scheduling

Describe a scheduling preference in plain text — "use line 3 less this week" or "run product 12345 on line 2 if possible". The AI translates your request into solver constraints, re-runs the optimization, and shows how the result compares to the base schedule.

  • Describe preferences in plain text
  • See the impact on makespan and per-line hours before committing
  • Compare the adjusted result against the original plan side by side

Your request

“Use line 3 less — it's been overloaded lately”

Result vs. baseline

LineBaselineWith rule
L1142h151h
L2168h138h
L3155h155h
L4147h154h
Makespan168h154h

Live Operations

Log actual production against the schedule in real time. Deviations surface immediately — no end-of-week reconciliation.

L1 — Premium Blend 1.0L87%
L2 — Light Mix 500mL100%
L3 — Standard Mix 1.0L95%

Results & Analysis

Compare planned vs. actual output week by week. Measure line utilisation, changeover frequency, and makespan trends.

W18
W19
W20
W21
W22

Disruption Re-planning

When a machine goes down or an order changes, re-plan the remaining week from the current position. Completed work is locked in — the solver only touches what's left.

Tue 09:15

Machine down

24 tasks

Locked completed

28 remaining

Re-optimised

Impact

What teams measure after deployment

makespan generates a production schedule from your order file and tracks actual output against the plan each week.

Less

Manual scheduling work

Planners review and adjust the generated schedule rather than building one from scratch each week.

Real-time

Deviation visibility

Actual vs. planned output tracked per line, per shift — not at end of week.

100%

Order coverage

The MILP solver only produces schedules that satisfy all order volumes and constraints.

Workflow

How it works

Three steps that work with what you already do.

1

Upload your order file

Export weekly production volumes from your ERP as an Excel file and upload it to makespan.

2

Review the schedule

makespan generates a full-week schedule. Review it, adjust individual tasks, split orders, or add manual entries.

3

Track and measure

Log actual production as shifts complete. Compare against the plan and carry findings into the following week.

Built for

Process manufacturers with repetitive, high-volume production

Food & Beverage

Multi-line filling and packaging with varied product mixes and changeover times.

Dairy & Alternatives

Products requiring CIP between runs and hygiene-interval enforcement across lines.

Pharmaceuticals

Strict batch sequencing and product separation enforced as hard solver constraints.

Consumer Goods

High-SKU operations where changeover costs are a significant share of capacity.

Done building schedules manually?

See how makespan generates a full-week production schedule from your order file.